Guangzhou Dewy Water Fountain Technology Co., LTD

Guangzhou Dewy Water Fountain Technology Co., LTD

Installation of pumps for the fountain project in Saudi Arabia

2026 06/01

At present, the main framework and pipeline fixation work for our large-scale square fountain project in Saudi Arabia have all been completed. Now, the stage of installing the water pumps has begun.

The water pump is the "power heart" of the fountain, determining the subsequent water pressure, the height of the water form, and the overall operational stability of the fountain. The masters followed the drawings to carry out the construction, confirmed the installation positions, and carefully completed the processes such as positioning, fixation, connecting the pipelines, and sealing and reinforcement of the water pump.

Saudi Arabia has a windy and sandy environment. All our pump equipment is made of stainless steel, which is resistant to high temperatures, corrosion and rust.

After the pump is installed, the next step will be the stage of circuit layout. The DEWY team is still meticulously working hard and is fully committed to advancing the project schedule.