Guangzhou Dewy Water Fountain Technology Co., LTD

Guangzhou Dewy Water Fountain Technology Co., LTD

Saudi Arabia Fountain Project Construction Update

2026 06/02

The DEWY professional installation team is currently at the music fountain project site in Saudi Arabia. The main framework of the fountain and the pipeline laying have been completed. At present, the installation of cables and the layout of the lines are underway.

The cables serve as the main framework for the fountain's lighting, water pumps, and control system, and directly affect the overall operation efficiency of the entire equipment. The technicians strictly followed the construction drawings to plan the route and distribute the cables.

The team worked in a coordinated manner, completing a series of tasks such as cable laying, fixation, line arrangement, interface protection, etc. in an orderly and efficient manner. In view of the hot and windy environment in Saudi Arabia, all the cables are made of materials that can withstand both high and low temperatures. Each section of the line is neatly arranged and has a regular direction, ensuring smooth circuit operation and electrical safety.

At present, the cable laying work is progressing steadily and all procedures are going smoothly. The DEWY team will continue to strictly control the quality and steadily advance the subsequent construction, striving to present the project in its entirety and perfection as soon as possible.